Mains included 29,400 linear feet of C900/RJ PVC Certa-Lok pipe by Westlake Pipe & Fittings: 10,300 feet of 6-inch diameter pipe; 4,300 feet of 8-inch; and 4,800 feet of 12-inch. Project leaders say the Certa-Lok pipe was ideal for installation by directional boring since its sections are connected with tight-locking couplings which don’t pull apart when pipe is pulled into place by the drilling machine.
Precision-machined grooves of pipe and couplers were aligned and a nylon spline was inserted to lock the pipe and coupling together. Services were 3/4- and 1-inch type K copper, the size depending on the length of the service. They, too, were installed by HDD.
Mains were installed primarily in residential areas. One line went along a state highway with mains branching off in easements adjacent to streets. Surface conditions of easements included asphalt and concrete streets and landscaped areas.
“We made approximately 300 bores for the mains and individual bores for each service connection,” said Tina Dillon, president of Atlas Excavating. “Subsurface conditions included sandy clay and clay. Bore lengths for mains ranged from 45 to 900 feet.”
Two of the company’s four HDD units were used: a 24,000-pound pullback Vermeer D24x40 and 30,000-pound pullback Case 6030. Pipe for 6- and 8-inch mains was pulled in directly behind a backreamer. For 12-inch pipe, one backreaming pass was made before the pull-in with PVC pipe pulled in a joint at a time.
“The connections were made so quickly it wasn’t necessary to assemble a string to install this type of pipe,” added Tony Kinsler, project manager for Atlas Project.
Kinsler says another interesting aspect of the job was that pilot holes for services went under the foundation of homes and exited into the houses. Plus, the town of Wheeler is separated by two sets of parallel railroad tracks owned by different railroads.
“Six railroad crossings were required,” DeWitt explained. “Since mains under the tracks had to be placed in steel casings, ductile iron pipes were installed by the jack-and-bore method, so these segments also employed trenchless construction.”
Originally budgeted for $2 million, the contract for the project came in at $1.6 million.
“The cost was lower in part because of directional drilling,” said DeWitt. “The project documents there can be significant cost savings when restoration items such as repairs to roadways, sidewalks and landscaping are not needed.”
DeWitt adds at one point during construction, the White Oak Conservancy District received complaints from citizens asking why construction had not started.
“When the district council replied that 50 percent of the pipe was already in the ground, the attitude changed,” he said. “Residents simply didn’t realize water pipe could be installed without digging trenches.”
The project’s innovative use of trenchless construction earned an award from the American Council of Engineering Companies of Indiana.