What are the installation guidelines for SDR 35 pipe?
SDR 35 gasketed sewer pipe should be installed in accordance with Westlake Pipe & Fittings installation guidelines and the project Design Engineer’s requirements. Installation includes proper trench preparation, placement of suitable embedment materials, and careful handling to avoid damage.
Pipe joints are assembled by ensuring clean bell and spigot surfaces, applying approved lubricant, and inserting the spigot to the marked insertion line without over-insertion.
Proper backfill and compaction are essential to support pipe performance.